With the kitchen remodel project behind me and warm weather I am once again fully focused on my house. During demo I saved some of the lathe as I knew I would need to fur out the studs surrounding windows and doors. The window and door moulding was installed accounting for the thickness of the lathe and 
Now that all the air ducts from the second floor have been run to the basement, I also have to frame in new ceilings and walls to hide the ducts in three closets. My cousin Cameron returned to help me out on that project. He handled all the cutting and nailing of the frames. We also raised the opening of the doorway from the living room to hall, so that it matches the height of the other two openings (kitchen to dining room and dining room to living room).
While hanging the furring strips I also worked to remove the remainder of the knob and tub and pulling all the nails out of the studs from both the walls and ceiling. This is critical in preparing for the drywall phase. That is too simple a task to not have it done prior to the drywall crew. I swear if I had a dollar for every nail I’ve removed I could afford to lift the house and completely replace the foundation.
The living room is completely finished. It is ready for wiring, insulation, new windows, drywall, paint, and floor refinishing. It’s really scary to think how close I am to the finish line. Once I get the other rooms to this level my professional trades will take over and things will fly! There’s a light in my tunnel.